banner

Products

Aluminum Alloy Pipe/Aluminum Tube for Lean Manufacture

Aluminum Alloy Pipe/Aluminum Tube for Lean Manufacture

Product Description:aluminum pipe for lean tube/Roller track/karakuri system Use lean pipe metal joint to connect and as
SHARE

Description

Basic Info.
Model NO. AL-4000C
Surface Treatment Oxidation
Forging Tolerance +/-0.1mm
Standard GB
Certification RoHS, ISO 9001:2000
Transport Package 10 PCS/Box
Specification 4020*100*100mm
Trademark king9
Origin China
HS Code 7608201090
Production Capacity 800000000meters/Year
Product Description
Product Description:aluminum pipe for lean tube/Roller track/karakuri system
Item No:Material:SurfaceColor codePackage size(mm)Package /box
AL-4000CAluminumOxidationsilver gray/silver white4020*100*10010PCS

Aluminum Alloy Pipe/Aluminum Tube for Lean Manufacture


Aluminum Alloy Pipe/Aluminum Tube for Lean Manufacture


Use lean pipe metal joint to connect and assemble modular pipe structure material storage racks, packing station, pipe structure gravity flow rack, FIFO flow pipe racks, operator workstation, push cart, mobile cart, etc. Or other DIY pipe rack system.

Aluminum Alloy Pipe/Aluminum Tube for Lean Manufacture


Aluminum Alloy Pipe/Aluminum Tube for Lean Manufacture


FAQ:
Q1: Are you manufacturer ?
A: Yes,We are manufacture since from 2000, is a well-known company with good reputation in China even Asia.Q2: If I need sample, could you support?
A: We can supply you with the sample for free, but the delivery charges will be covered by our customers. For avoiding the misunderstanding, it is appreciated if you can provide the International Express Account for Freight Collect.Q3: How do you pack your product?
A: Packing steps for aluminum windows:Step 1.Protective tape protects frames from scratches;Step 2.Keep windows fixed on iron pallets;Step 3.Tie up windows on the iron pallets with plastic belts;Step 4.PE films keep windows away from sea water;Step 5.Fill in the space between each two iron pallets by air bags;Step 6.Tie up iron pallets in container with plastic belts.Our packages will ensure the windows arrive at project jobsite in good conditionsQ4: What's your payment term?
A: For the fist order, we usually use 30% T/T deposit + 70% T/T before loading the container. For future order, we can do 30% T/T deposit + 70% T/T balance against B/L copy.

Our Contact